ABSTRACT
This project work entitled “Internal Control System in Government Establishment: A case study of Project Development Institute (PRODA) Enugu” spans through five chapters.
The first chapter which is the introductory aspect of the work discusses specific issues such as the statement of the problems, purpose of the study, significance of the study, and methodology. This chapter is concluded with ht formulation of a working with the hypotheses and definition of terms used.
The second chapter dealt with a review of related literatures. This chapter proves to be quite exciting as the writer got exposed to numerous works rich in the above subject matter. Both local and foreign related literatures were review.
The third chapter discusses in great details the resea